Community Category: Construction


New lane configurations on Figueroa

Over the weekend, traffic lanes were reconfigured on Figueroa St, between Exposition Blvd and 22nd St, to allow for two lanes of car traffic on either side of the street. The two median islands on this stretch are scheduled …

View Post

Figueroa Improvements/ Construction

If you live or work in the MyFigueroa area, you’ve likely noticed that construction is well underway on 11th Street. 11th Street is closed to one lane from Los Angeles Street to Figueroa, to allow for construction in the roadway …

View Post

French Firm Chosen to Redesign Pershing Square

DTLA — People who live and work in Downtown Los Angeles have long asked for a change at Pershing Square, which was originally a park filled with greenery, but for several decades has been better described as a parking garage …

View Post

Street Wize Site

The City of Los Angeles recently launched Street Wize (http://streetwize.lacity.org/) an interactive map that tracks current and upcoming construction projects and their completion date. The site covers all forms of street construction — street repairs, curb repairs, excavations

View Post

Tree Removal for 2nd/Hope Station

Metro Regional Connector Transit Project Update

OCTOBER 27, 2015

Tree Removal at 2nd/Hope Station

SUMMARY

In preparation for excavation activities at the future 2nd/Hope Station, Regional Connector Constructors (RCC) will be removing total of 46 trees in the area bound by 3rd St.,

View Post

Fig Central Complex Underway

A skyline-altering retail, residential and hotel complex with three high-rise towers in the bustling South Park neighborhood in downtown Los Angeles is finally moving forward.…

View Post

Website Designed and Built by Elimint | Log in